Separate the process stages
Map the stages you perform in house and those supplied by a partner. The current catalog covers equipment for casting and core preparation, machining, polishing, assembly and testing. A list of machines does not by itself define an integrated production line.
Start at the bottleneck
Describe the part entering and leaving the operation, the required output and the existing handling method. For assembly, identify the components and joining operations. For testing, provide the applicable product requirements and the measurements to be recorded.
Review the interfaces
For a project spanning several stages, discuss part orientation, fixtures, loading, utilities, space and operator responsibilities. Confirm which interfaces are included in each equipment proposal and how the complete process will be checked.
Buyer questions
Can I request equipment for one stage of an existing line?
Yes. Begin with the stage you want to discuss, the incoming part condition and the required result. Include information about the adjacent operations so interfaces can be reviewed.
Does a testing machine certify the finished product?
A machine’s presence alone does not establish product certification. Agree on the required test method, limits, records and any independent assessment applicable to your product.